OmniGrip HF – Safety improvement in Caroline Springs

Installed by STS  in the September School Holiday of 2016 as part of the Melton Council Road Safety Initiative OmniGrip HF has been recently applied to the roundabout about at Caroline Springs Boulevard and  Bellfield Avenue. The OmniGrip HF calcined bauxite overlay is designed to provide maximum surface texture and friction for vehicles travelling through the busy location thus minimising the potential for wet weather run off road incidents associated with loss of traction

caroline-springs13 caroline-springs15

 


OmniGrip CST – Rainbow Road, St Kilda

Recently completed in August 2018 by STS using OmniGrip CST the ... read more »

OmniGrip HF – Safety improvement in Caroline Springs

Installed by STS  in the September School Holiday of 2016 as part of the Melton Council Road Safety Initiative OmniGrip ... read more »